Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Parcel Search

 
Parcel Attributes
Parcel110034620
JurisdictionTucson, Pima County
Water Course

Wash

City of Tucson ZoningR-2
Tucson WardWard 3
Pima County Data Assessor, Recorder, Treasurer, ...
Parcel Map Map
Address
Parcel Attributes Issue?

Annexations & Original City Zoning (OCZ)

Date - 12/17/2025 6:40 p.m.
Total Number Of OZC Plans - (1)
Plan Description Annexation Ordinance Effective Date OCZ Ordinance
C9-69-106 Christopher City 3376 01/30/1970 3423

Rezoning Cases

Date - 12/17/2025 6:40 p.m.
Total Number Of Rezone Cases - (3)
Case No. Description New Zone Status Status Date Address
C9-01-26 KB Home - Columbus Boulevard R-2 Effectuated 02/13/2008 3551 N LILLY POND
C9-99-18 University of Arizona - Columbus Boulevard C-2 Withdrawn 06/07/2008 3551 N LILLY POND
C9-99-18 University of Arizona - Columbus Boulevard R-2 Withdrawn 06/07/2008 3551 N LILLY POND

Permits

Parcel Number - 110034620
Date - 12/17/2025 6:40 p.m.
Total Number Of Permits - (6)
Permit Permit Status Entered Date Expired Date Unit Type Description
TC-RES-0825-04072 Inspections 08/18/2025 05/18/2026 Residential Building - One or Two Family Roof mount 6.53 kW DC photovoltaic solar system; 15 modules with microinverters. 10 kWh Storage, 1 Enphase 10C battery. IQ combiner for PV and Batteries. 14-50 EV charger in Combiner Box. NEW backed up loads panel with 225A bus and 150A MCB. Partial home backup with Enphase meter collar on NEW 200A Meter Base. 200A bus with 200A MCB, interconnection via PCS.
TE-FPU-0825-00327 Issued 08/18/2025 N/A Floodplain Use Roof mount 6.53 kW DC photovoltaic solar system; 15 modules with microinverters. 10 kWh Storage, 1 Enphase 10C battery. IQ combiner for PV and Batteries. 14-50 EV charger in Combiner Box. NEW backed up loads panel with 225A bus and 150A MCB. Partial home backup with Enphase meter collar on NEW 200A Meter Base. 200A bus with 200A MCB, interconnection via PCS.
T03CM05064 Final 10/23/2003 10/23/2004 COMBO SFR:TD#15-53-53
T03OT01880 Final 10/23/2003 N/A FLOODPLN FLOODPLAIN USE PERMIT
T04BU00805 Final 03/30/2004 11/22/2004 POOL/SPA POOL:GUNITE TD#15-53-56
T21CM00277 Final 01/08/2021 07/21/2021 COMBO install new 1 ton mini split