Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Parcel Search

 
Parcel Attributes
Parcel10510001C
JurisdictionTucson, Pima County
City of Tucson ZoningC-2
Tucson WardWard 3
Major Street & Route

Arterial or Collector

Pima County Data Assessor, Recorder, Treasurer, ...
Parcel Map Map
Address
Parcel Attributes Issue?

Annexations & Original City Zoning (OCZ)

Date - 12/31/2025 1:55 p.m.
Total Number Of OZC Plans - (1)
Plan Description Annexation Ordinance Effective Date OCZ Ordinance
C9-82-48 Oracle Rd. - Wetmore Rd. II 5646 09/20/1982 5651

Special Development Requests & Requirements

Date - 12/31/2025 1:55 p.m.
Total Number Of Special Development Permits - (1)
Activity Number Status Apply Date Expired Date Type Description
T16SA00310 Withdrwn N/A MMJ Application

Permits

Parcel Number - 10510001C
Date - 12/31/2025 1:55 p.m.
Total Number Of Permits - (9)
Permit Permit Status Entered Date Expired Date Unit Type Description
TR-ROW-0525-00599 Withdrawn 05/05/2025 N/A Right-of-Way (ROW) We will be performing twenty-one (21) geotechnical borings within the roadway of N 1st Ave from approximately 500ft north of the intersection of E River Rd and N 1st Ave to approximately 400ft north of the intersection of N 1st Ave and Grant Rd. Asphalt coring will be conducted prior to drilling of soil borings. Cores will be obtained using an electric coring rig and will be approximately 10 inches in diameter. The soil borings will be advanced through the 10 inch asphalt core hole with 7 or 8 inch hollow stem auger to depths of approximately 5 to 150 feet below the ground surface (135 to 150ft borings will be performed near the 1st Avenue Bridge crossing the Rillito River. The borings will be backfilled with auger cuttings mixed with concrete (with concrete comprising between 20 to 50% of the soil-cement backfill). The exposed asphalt concrete at each boring location will be cleaned, wire-brushed, and patched with QPR brand asphalt cold path. (We understand the restoration of boring locations in the existing roadway as described above will be acceptable by the City of Tucson.) If groundwater is encountered during drilling, the boring will be backfilled with cement grout to the state minimum of the upper 20 feet, unless otherwise within the threshold distance of a WQARF, CERCLA, VRP, LUST, or DOD site, the boring(s) will be backfilled with cement grout to the full depth of the boring. See site plan for details on locations of planned boreholes and traffic control plans for anticipated one-lane closures along N 1st Ave. We do not anticipate performing any work within signalized intersections. Requesting no restrictions on work times. 135 to 150ft bridge borings will be performed as night work. Work performed for HDR Engineering for the City of Tucson, Contract No. 230193-01. 05/22/2025 **Withdrawn as of 05/21/2025 CONTINUATION OF TR-ROW-0325-00338*** NO LONGER NEEDED
TR-ROW-0823-01089 Complete 08/23/2023 10/05/2023 Right-of-Way (ROW) Complete misc safety improvements on the 1st Ave bridge across the Rillito River. Refer to City of Tucson JOC project 171650, SCN-0001783, Tom Adkins
TR-UTL-1022-00116 Complete 10/31/2022 11/20/2022 Right-of-Way (ROW) - Utility EMERGENCY LINE CROSSING FOR CABLE REPAIR - START TIME 5AM-6:30AM
T06CM02420 Withdrwn 04/25/2006 N/A COMBO REPAIR LIGHT FIXTURE ON BILLBOARD
T08OT02239 Final 09/18/2008 05/18/2009 SIGN 15631
T11EX00491 Closed 09/15/2011 11/14/2011 EXCAV TRENCH, BORE, REPAIR AND INST 190LF OF FIBER OPTIC CABLE FOR COX COMM.
T14OT00282 Final 03/11/2014 06/13/2015 SIGN A frame sign
T20RW05785 Final 10/21/2020 01/01/2021 ROW Starting on the West side of N 1st Ave at Cox Ped trench/bore 10' going West to out of ROW.
T22RW00459 Final 02/09/2022 06/03/2022 ROW Tie into Pole riser down and Head N 6' pulling 48ct fiber through existing Cox Conduit and intercept existing Cox Vault. Continue Heading N 91' pulling 48ct fiber through existing Cox Conduit. Head E 6' and continue pull through onto private property. ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. UNDER A PAVEMENT MORATORIUM, ANY NEW ASPHALT THAT IS DISTURBED WILL REQUIRE A 2” MILL AND OVERLAY FOR 50’ IN EACH DIRECTION FROM THE OUTSIDE OF THE CUT FOR ALL EFFECTED TRAVEL LANES. ARTERIAL / COLLECTOR FLOOD PLAIN ZONE WORK IS BEHIND 4545 N 1ST AV - ADDRESS ON PERMIT IS FOR PERMITTING PURPOSES ONLY ADDRESS ON APPLICATION- 4502 N 1ST AV

Code Enforcement

Parcel Number - 10510001C
Date - 12/31/2025 1:55 p.m.
Total Number Of Code Cases - 10
Case Number Case Status Entered Date Closed Date Unit Type Description
T08DV04288 Complian 05/21/2008 N/A DNR_VIOL ILLEGAL BANNER/SIGN
T09FR01769 Complete 05/21/2009 N/A FIREINSP FULL FIRE INSPECTION
T11DV00437 Complian 01/25/2011 N/A DNR_VIOL 3 Flads in the Right of Way and 3 Banners on the brick wall in the front wall street side.
T11DV02519 Complian 04/13/2011 N/A DNR_VIOL Sign violation.
T11DV04277 Complian 06/09/2011 N/A DNR_VIOL SIGNS ON PROPERTY
T13DV00319 Complian 01/15/2013 N/A DNR_VIOL Brake Max wall facing the river park is tagged.
T13DV06571 Complian 09/05/2013 N/A DNR_VIOL UNSTABLE FLAGS AND BANNERS
T13DV07638 Complian 10/11/2013 N/A DNR_VIOL Sign violation flags in front of business
T14DV00494 Complian 01/28/2014 N/A DNR_VIOL ILLEGAL SIGNS IN FRONT OF BUSINESS. CE14 AREA.
T14DV01272 Complian 03/05/2014 N/A DNR_VIOL Signs- flags/banners placed on easement blocking view to on coming traffic.(PRO )