Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Parcel Search
 
Parcel Attributes
Parcel105040200
JurisdictionTucson, Pima County
City of Tucson ZoningRX-1
Tucson WardWard 3
Major Street & Route

Scenic Route

Pima County Data Assessor, Recorder, Treasurer, ...
Parcel Map Map
Address
Parcel Attributes Issue?

Annexations & Original City Zoning (OCZ)

Date - 08/17/2026 11:04 p.m.
Total Number Of OZC Plans - (2)
Plan Description Annexation Ordinance Effective Date OCZ Ordinance
C9-86-48 Harding Ranch 6479 10/09/1986 6657
C15-00-07 River/Stone 9503 02/21/2001 9542

Special Development Requests & Requirements

Date - 08/17/2026 11:04 p.m.
Total Number Of Special Development Permits - (1)
Activity Number Status Apply Date Expired Date Type Description
H000008818 Closed N/A

Permits

Parcel Number - 105040200
Date - 08/17/2026 11:04 p.m.
Total Number Of Permits - (6)
Permit Permit Status Entered Date Expired Date Unit Type Description
TR-UTL-0325-00436 Complete 03/14/2025 07/03/2025 Right-of-Way (ROW) - Utility Cox to bore 136' to install conduit and place vaults for system tie.
T22RW03543 Renewal/extension fees due 09/29/2022 11/13/2022 Right-of-Way (ROW) (1) 4' X 12' BELL HOLE IN FRONT DIRT ALONG E RIVER RD. (1) 2' X 30' TRENCH IN FRONT DIRT ALONG E RIVER RD TO INSTALL NEW GAS SERVICE LINE. Work Order: 4529774 ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. NOTE: WORK IS IN FRONT OF 215 E RIVER RD - ADDRESS ON PERMIT IS FOR PERMITTING PURPOSES ONLY. ADDRESS ON APPLICATION - 333 E RIVER RD BUS STOP IN THE AREA, CONTACT SUN TRAN DISPATCH, AT 520-206-8934 AND/OR BEA PAULUS AT 520-206-8826 AT LEAST 48-BUSINESS HOURS PRIOR TO START OF WORK FOR COORDINATION. PERMIT IS VALID FOR CITY OF TUCSON ROW ONLY.
TR-UTL-1025-01738 Complete 10/03/2025 12/17/2025 Right-of-Way (ROW) - Utility Renew for 30 days from the current expiration date 11/17/2025. New expiration date will be 12/17/2025 Starting at the doghouse next to the pole on the southeast corner of 120 W River rd set a new vault and bore 67' south, then 246' SW towards stone loop, then 94' NE and set another vault (Pima). From this vault bore 720' along the south side of Stone Loop, then north 58' across stone loop and set another vault. From this vault follow stone loop towards river rd for 385' (Tucson) then continue East 315' and set another Vault. From this vault bore 500' east and set a vault, then another 485' east and finally 30' north and set a final vault next to our ped south of 333 e river rd.
T01CM05438 Final 11/01/2001 03/24/2004 COMBO REMODEL:KITCHEN &BATH/NEW CIRCUITS/REPLACE CONDENSERS/REPLACE DOORS & WINDOWS/REPLACE GAS PIPES
T17RW01777 Expired 04/26/2017 06/28/2017 ROW ISSAP (PH. II/III) ATLAS 0321 (1 LOCATION) - ABANDON/REPLACE/TIE OVER GAS LINES AT VARIOUS LOCATIONS. (1) 200' TRENCH IN DIRT SHOULDER
T19RW00383 Final 01/24/2019 02/24/2019 ROW (2) 5 X 5 BELLHOLES IN DIRT/BLKTOP FRONT WITH APPROX 30 FEET IN DIRT - TO REPAIR/REPLACE GAS LINE ADDDRESS ON APPLICATION IS 363 E RIVER RD