Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Parcel Search

 
Parcel Attributes
Parcel10319001N
JurisdictionTucson, Pima County
City of Tucson ZoningR-1
Tucson WardWard 1
Pima County Data Assessor, Recorder, Treasurer, ...
Parcel Map Map
Address
Parcel Attributes Issue?

Annexations & Original City Zoning (OCZ)

Date - 12/07/2025 1:57 a.m.
Total Number Of OZC Plans - (1)
Plan Description Annexation Ordinance Effective Date OCZ Ordinance
C9-81-02 Goret - Silverbell 5278 12/23/1980 5392

Rezoning Cases

Date - 12/07/2025 1:57 a.m.
Total Number Of Rezone Cases - (1)
Case No. Description New Zone Status Status Date Address
C9-07-12 City of Tucson-Silverbell Road OS Effectuated 04/25/2007 2802 N CERRADA DE BETO

Permits

Parcel Number - 10319001N
Date - 12/07/2025 1:57 a.m.
Total Number Of Permits - (7)
Permit Permit Status Entered Date Expired Date Unit Type Description
DP20-0056 Complete 03/12/2020 04/10/2023 Development Package SITE/GRADING - Rima-Nowak residence, SFR, residential grading, retaining wall.
TC-RES-0823-07496 Complete 08/21/2023 10/23/2024 Residential Building - One or Two Family Installation of a 683 sf pool and 49 sf spa
T20CM02431 C of o 04/20/2020 01/23/2022 COMBO NEW SFR
T20RW04274 Final 07/24/2020 08/23/2020 ROW Install of new 1" service.
T21BU00244 Issued 05/10/2021 11/06/2021 POOL/SPA New Pool & Spa for the Rima-Nowak Residence
T21RW01097 Final 03/09/2021 04/11/2021 ROW 2 5x5 bellholes in dirt/blktop front-- to repair/replace gas line
T21RW01827 Final 04/19/2021 06/18/2021 ROW R1 PLAN CHANGE - Scope of Work now: TEP pole S of 2802 N Cerada De Beto, begin 171' aerial overlash, adding .625 coax cable, heading west to TEP pole, riser down and begin 30' pull through existing conduit heading North to out of ROW. Continue From TEP pole heading 103' east, tie in . TEP pole S of 2802 N Cerada De Beto, begin 276' aerial overlash, adding .625 coax cable heading West to TEP pole, tie in. Proof of notification is required at the time of the preconstruction meeting.