Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Parcel Search

 
Parcel Attributes
Parcel103181930
JurisdictionTucson
City of Tucson ZoningMH-1
Tucson WardWard 3
Major Streets & Routes

Scenic Route

Pima County Data Assessor, Recorder, Treasurer, ...
Parcel Map Map
Address

Annexations & Original City Zoning (OCZ)

Date - 11/22/2024 10:16 p.m.
Total Number Of OZC Plans - (1)
Plan Description Annexation Ordinance Effective Date OCZ Ordinance
C9-60-39 West To Silverbell Road And South To San Xavier Indian Reservation 2014 03/18/1960 2045

Rezoning Cases

Date - 11/22/2024 10:16 p.m.
Total Number Of Rezone Cases - (1)
Case No. Description New Zone Status Status Date Address
C9-78-41 Wells - Silverbell Road R-2 Withdrawn 05/19/2011 W SILVERBELL TREE

Permits

Parcel Number - 103181930
Date - 11/22/2024 10:16 p.m.
Total Number Of Permits - (7)
Permit Permit Status Entered Date Expired Date Unit Type Description
T18RW01459 In review 03/29/2018 N/A Right-of-Way (ROW) WORKING WITHOUT A PERMIT. PLANTS AND IRRIGATION INSTALLED IN THE COT ROW WITHOUT PRIOR APPROVAL OR A
T00BU01769 Expired 06/12/2000 12/25/2000 TEMP-FBB TEMP FBB:CONSTRUCTION TRAILER
T03CM00311 Final 01/23/2003 11/11/2003 COMBO SFR:TD#15-70-33
T03OT00602 Final 04/08/2003 11/26/2003 SIGN SIGN:5331
T17RW03917 Expired 09/01/2017 09/28/2017 ROW NOV ISSUED FOR WORKING WITHOUT A PERMIT. OPEN TRENCH ON FRONT AND BACK OF SIDEWALK LOCATED AT 2432 W SILVERBELL TREE DR. SILVERBELL TREE IS UNDER THE NO CUT PAVEMENT 5 YEAR MORATORIUM. 50LF ON BOTH SIDES OF THE CUT IS REQUIRED TO BE PAVED THE FULL WIDTH OF THE TRAVEL LANE.
T18RW03857 Final 08/28/2018 09/29/2018 ROW 4’ x 4’ asphalt patch - FAILING PATCH IN NEED OF REPAIR
T20RW05361 Final 10/01/2020 11/11/2020 ROW This work will involve drilling of 21 soil borings throughout a neighborhood near Silver Island Way and Silver Honey Place. Work will be completed in two phases. Phase 1 will involve completion of 5 borings on October 12-14, 2020. Phase two will involve completion of up to 16 borings on November 2-4, 2020. Please see attached Site Map and Traffic Control Plan for details. Note project dates are anticipated and may change based on date of permit approval. This work is being done on behalf of Arizona Department of Environmental Quality (ADEQ). The borings will be located in the street pavement and drilled up to 15 feet below ground surface. Boring diameters will be approximately 3 inches. Restoration will involve soil cuttings used to backfill the boring to approximately 1 foot below ground surface, and cold patch asphalt will be used to match existing grade