Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Parcel Search: 103083120
Parcel Search
Parcel Attributes
| Parcel | 103083120 |
|---|---|
| Jurisdiction | Tucson, Pima County |
| City of Tucson Zoning | R-1 |
| Tucson Ward | Ward 3 |
| Flood Related Information | FEMA Floodplain Area |
| Major Street & Route | Scenic Route, Arterial or Collector |
| Pima County Data | Assessor, Recorder, Treasurer, ... |
| Parcel Map | Map |
| Addresses | |
| Parcel Attributes Issue? | |
Annexations & Original City Zoning (OCZ)
Date - 01/14/2026 9:04 p.m.
Total Number Of OZC Plans - (2)
Rezoning Cases
Date - 01/14/2026 9:04 p.m.
Total Number Of Rezone Cases - (4)
| Case No. | Description | New Zone | Status | Status Date | Address |
|---|---|---|---|---|---|
| C9-72-85 | City of Tucson - Sewer Farm | P-I | Withdrawn | 09/15/2011 | 3200 N SILVERBELL |
| C9-72-85 | City of Tucson - Sewer Farm | P-I | Withdrawn | 09/15/2011 | 3600 N SILVERBELL |
| C9-72-85 | City of Tucson - Sewer Farm | P-I | Withdrawn | 09/15/2011 | 3608 N SILVERBELL |
| C9-72-85 | City of Tucson - Sewer Farm | P-I | Withdrawn | 09/15/2011 | 3612 N SILVERBELL |
Permits
Parcel Number - 103083120
Date - 01/14/2026 9:04 p.m.
Total Number Of Permits - (3)
| Permit | Permit Status | Entered Date | Expired Date | Unit | Type | Description |
|---|---|---|---|---|---|---|
| TR-UTL-0223-00822 | Complete | 02/09/2023 | 06/06/2023 | Right-of-Way (ROW) - Utility | COX TO OVERLASH 2,297' OF AERIAL, TRENCH 2', AND BORE 235' TO PLACE NEW PED FOR SYSTEM TIE | |
| TC-COM-0225-00354 | Complete | 02/19/2025 | 12/22/2025 | Commercial Building | adding two new floor sinks on the existing grease waste system to serve indirect drains for existing kitchen plumbing fixtures. | |
| TZ-CMP-1225-00225 | In review | 12/18/2025 | N/A | Zoning Compliance | Tucson Water is applying for an amendment to the Sweetwater Recharge Facility's Aquifer Protection Permit. The goal of this permit modification is to increase the permitted aquifer storage volume of the facility. To proceed with the submission, ADEQ requires zoning compliance. Please provide a "Zoning Compliance" letter. |