Parcel Search: 10304001Q
Parcel Search
Parcel Attributes
Parcel | 10304001Q |
---|---|
City of Tucson Zoning | RX-1 |
Tucson Ward | Ward 3 |
Major Streets & Routes | Scenic Route |
Pima County Data | Assessor, Recorder, Treasurer, ... |
Parcel Map | Map |
Permits
Parcel Number - 10304001Q
Date - 11/25/2024 9:46 p.m.
Total Number Of Permits - (13)
Permit | Permit Status | Entered Date | Expired Date | Unit | Type | Description |
---|---|---|---|---|---|---|
T22RW00054 | Complete | 01/10/2022 | 10/23/2022 | Right-of-Way (ROW) | SILVERBELL RD: EL CAMINO DEL CERRO TO GORET RDThis Application to include work orders 6306931, 6; Work Order: 6351728 6306931, 635 | |
T22RW00783 | In revision | 03/04/2022 | 09/03/2022 | Right-of-Way (ROW) | SILVERBELL RD: EL CAMINO DEL CERRO TO GORET RD., ROADWAY AND DRAINAGE IMPROVEMENT, COT PROJECT NO.; Work Order: 4323584 | |
TR-ROW-0323-00511 | Issued | 03/20/2023 | 08/10/2023 | Right-of-Way (ROW) | City OF Tucson IT fiber optic relocation to accommodate the Siverbell road improvement project. | |
T20RW05499 | Complete | 10/07/2020 | 12/31/2022 | Right-of-Way (ROW) | SILVERBELL RD: GORET RD TO CAMINO DEL CERRO, PROJECT NO. SR6AARCHAEOLOGICAL EXPLORATION ALONG RO; Work Order: SR6A | |
T22RW03726 | Complete | 10/11/2022 | 01/15/2023 | Right-of-Way (ROW) | CAPITAL PROJECT NAME - SR6AFrom 3240 W Sweetwater Dr, Continuing from PRJ219129-2, place 3800'; Work Order: PRJ219129-3 | |
T08CM03196 | Expired | 09/24/2008 | 03/25/2009 | COMBO | TEMP JOB TRAILER W/ELECTRIC | |
T16RW00831 | Final | 07/27/2016 | 09/02/2016 | ROW | TPD CASE #1506010050, PARKING IN ROW TO REMOVE A TEP POLE | |
T17RW00347 | Expired | 01/20/2017 | 01/20/2018 | ROW | PIMA ANIMAL CARE CENTER IMPROVEMENTS FLOODPLAIN PERMIT | |
T18RW00383 | Final | 01/23/2018 | 03/03/2018 | ROW | INSTALL TWO SPECIAL SIGNS ALONG SILVERBELL ROAD WITHIN DIRT SHOULDER TO ASSIST WITH LOCATING THE PIMA ANIMAL CARE CENTER. | |
T18RW02033 | Final | 05/03/2018 | 06/03/2018 | ROW | PAVE 24' X 20' DRIVEWAY ENTRANCE REMOVE AND REPLACE EXISTING ASPHALT DRIVEWAY ON SILVERBELL RD. MATCH EXISTING GRADE. PAVEMENT CUT MORATORIUM ON SILVERBELL. TRAVEL AND BICYLE LANES SHALL NOT BE DISTURBED. | |
T19RW05455 | Final | 09/21/2019 | 10/24/2019 | ROW | INSTALLING 2 - 1" WATER SERVICES NOTE: TRENCH SHALL BE PLATED OVER AFTERNOON AND ROAD OPENED UP TO TRAFFIC BY 3:30PM. | |
T21RW04479 | Final | 09/29/2021 | 10/31/2021 | ROW | TUCSON ELECTRIC POWER, POWER POLE RELOCATION AND MODIFICATION / SILVERBELL ROAD / SCENIC CORRIDOR SIGN INSTALLATION FOR VARIANCE PROCESS - POSTING SIGNAGE IN CITY OF TUCSON ROW TO NOTIFY PUBLIC OF UPCOMING BOARD OF ADJUSTMENT HEARING. VARIANCE ACTIVITY T21SA00376. SIGNS SHALL BE POSTED ON 48" X 31" BOARD. 1. SIGN FACES SHALL BE MADE OF PLYWOOD, CORRUGATED PLASTIC SHEET SUCH AS COROPLAST, OR SIMILAR ALL WEATHER, STURDY MATERIAL. 2. SIGNS SHALL BE SECURELY MOUNTED TO A MINIMUM OF ONE 2"X2" WOODEN POST OR STRUCTURAL EQUIVALENT AND BURIED AT LEAST 18 INCHES INTO THE GROUND 3. BOTTOM OF SIGN SHALL BE NO LESS THAN 30 INCHES ABOVE GRADE. 4. FINISHED HEIGHT SHALL BE NO MORE THAN SIX FEET ABOVE GRADE. SIGN INSTALLATION SHOULD NOT BE PLACED IN SIGHT VISIBILTY TRIANGLES LOOKING IN BOTH DIRECTIONS NEAR INTERSECTION. THE SIGNS SHOULD BE PLACED OUTSIDE THE "CLEAR ZONE" FROM EDGE OF TRAVEL WAY. REFER TO THE SIGHT VISIBILITY REQUIREMENTS CONTAINED IN SECTION 10-01.5.0 OF THE TECHNICAL STANDARDS MANUAL. | |
T22RW01445 | Final | 04/12/2022 | 08/19/2022 | ROW | From 3240 W Sweetwater Dr, Continuing from PRJ219129-2, place 3800' aerial overlash fiber and coax. Continue heading S on E side of Silverbell on PRJ219129-4. Trench 20' W from existing PS in to Pima ROW. Please see Civil Drawings for Detail. Trench/bore 100' from new pole on E Side of Silverbell to West side. Pot hole existing coax and pull new. Please see Civil drawings for detail. ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRATIVE MANUAL. UNDER A PAVEMENT MORATORIUM, ANY NEW ASPHALT THAT IS DISTURBED WILL REQUIRE A 2" MILL AND OVERLAY FOR 25’ IN EACH DIRECTION FROM THE OUTSIDE OF THE CUT FOR ALL EFFECTED TRAVEL LANES. This project is located in an Archaeological Sensitivity Zone. An Archaeological Monitor hired by the permit applicant is required to be on-site during any digging, unless a waiver is issued. Monitoring reports are to be submitted to Historic Preservation Office, City of Tucson, P.O. Box 27210, Tucson, AZ 85726.** Please contact Jodie Brown at Jodie.Brown@tucsonaz.gov with any questions. ADDRESS ON APPLICATION - 3240 W SWEETWATER DR |
Plans
Parcel Number - 10304001Q
Date - 11/25/2024 9:46 p.m.
Total Number Of Plans - 1
Plan Number | Plan Status | Application Date | Expired Date | Unit | Type | Description |
---|---|---|---|---|---|---|
T16PI00031 | Needs resubmittal | 12/22/2016 | N/A | Private Improvement Agreement | PIMA COUNTY ANIMAL CARE CENTER |