Inspection Status: In Field Accepted
Inspection History: TWPE Summary review of Daily Field Inspections
| Date |
Description |
Inspector |
Results |
Comments |
| 10/05/2026 |
TWPE Summary review of Daily Field Inspections |
|
In Field Accepted |
Herman installed and leveled out the meter assembly. They poured concrete collars and re-energized the cemeteries service lines. The cemetery now has their own gate valves where they can isolate outside of our meter assembly. Herman backfilled and compacted trench and 1 foot lifts. The meter assembly will be painted this week and the chain link fence will be installed as well. The survey crew went out to get elevations and stations updated. |
|
TWPE Summary review of Daily Field Inspections |
|
Scheduled |
|