Inspection Status: Partial Pass
Inspection History: COT - ENGR - Sign Electrical
| Date |
Description |
Inspector |
Results |
Comments |
| 05/10/2024 |
COT - ENGR - Sign Electrical |
|
Partial Pass |
I have a look at the site work has been done for the installation of the sign in the Elejiko, but it’s not complete at this time. Complete the site work and provide photographs of all electrical, including the 20 amp fuse in the electrical panel that services, the sign, and the timer in which the sign is attached to. Once these have been provided to the city of Tucson, and you have completed all work on the site, you can schedule a final inspection to be done at that time |
| 07/01/2024 |
COT - ENGR - Sign Electrical |
|
Passed |
|