Inspection Status: Re-inspection required
Inspection History: TRSP - ROW - Final
| Date |
Description |
Inspector |
Results |
Comments |
| 06/11/2025 |
TRSP - ROW - Final |
|
Re-inspection required |
Contractor agreed to use slurry backfill and to replace the plugs using a tack seal, but instead cold mix temporary patches are in place. So final paver repair has not been completed |