Inspection History Details
Inspection Status: Re-inspection required
Inspection History: TRSP - PIA - Curb Placement
Permit Number - TR-PIA-0225-00001
Inspection Description - TRSP - PIA - Curb Placement
Inspection Status - Re-inspection required
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/03/2025 | TRSP - PIA - Curb Placement | Re-inspection required | Density tests were taken at the intersection of Lalas and Pyramid Ridge at stations 2+75 and 9+35 at the NW corner as well as station 10+25 along the E side of Pyramid Ridge. Both tests failed for compaction with the highest being at 91%. A retest will be needed the next day. | |
| 11/05/2025 | TRSP - PIA - Curb Placement | Passed | The curb was poured using a curb machine and concrete provided by CEMEX. The mix design used was 1632413 3000 PSI Class S. The slump came in at .5" and was specked at 1" being that it is curb machine. Joints, expansion and contraction were placed at 40 foot intervals along with 10 foot intervals. The ramp areas were formed out as well as the face was finished smoothly in preparation for curing compound and stiff brush finish. A total of 21 yards were poured. Sample cylinders were made and left on site by David Quintero, a CoT technician. | |
| TRSP - PIA - Curb Placement | Scheduled |