Inspection Status: Canceled

Inspection History: FCON – OH Piping & Hydro

Date Description Inspector Results Comments
FCON – OH Piping & Hydro Canceled
FCON – OH Piping & Hydro Not Ready
FCON – OH Piping & Hydro Not Ready Per Kenny Frank
03/01/2023 FCON – OH Piping & Hydro Partial Pass 75 psi. Only pod b was observed. no branch lines were modified.
03/08/2023 FCON – OH Piping & Hydro Partial Pass pods a&d and NW shell
04/13/2023 FCON – OH Piping & Hydro Partial Pass Approved c&f
05/09/2023 FCON – OH Piping & Hydro Partial Pass Corridors on west end of building. ensure coverage at final
02/02/2024 FCON – OH Piping & Hydro Passed