Inspection History Details
Inspection Status: Partial Pass
Inspection History: PDSD Engineering Division Pre-Construction SITE
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/09/2026 | PDSD Engineering Division Pre-Construction SITE | Partial Pass | Okay for clearing/grubbing, NPPO relocation, and Site survey/testing only. When full work is approved to begin, recall this Pre-Con for further direction. | |
| 09/29/2026 | PDSD Engineering Division Pre-Construction SITE | Partial Pass | I met with General contractor and Boyd the underground contractors. I need see CGP/ NOI in place. I also need to go over DP with General Contractor/Superintendent. The Rain cut off the meeting. Okay to proceed with installing the Drainage Chambers. adjacent to Construction entrance. Reschedule when ready |
|
| 10/16/2026 | PDSD Engineering Division Pre-Construction SITE | Passed | NDC on file. |