Inspection History Details
Inspection Status: Not Ready
Inspection History: SITE - Stormwater Setup and Controls
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/29/2026 | SITE - Stormwater Setup and Controls | Not Ready | 9/29/26 -Track out rock needs to be 2 to 3". Current rock is too small. fFix this and build it per plan From SWPPP. -Wattle needs to be placed so that the overlaps are side-by-side and it needs to overlap 2 feet at the end of sections. The drainage coming out of the storage unit units needs a more wattle check dams before it reaches the drainage channel. Fix the waddle so it is per plan where this drainage meets the main channel. -Install SWPPP board at Entrance. SWPPP book needs to be on site and accessible. |
|
| 10/16/2026 | SITE - Stormwater Setup and Controls | Passed | Non Discharge Certificate on file. Ensure site is maintained to prevent any stormwater discharges. |