Inspection Status: Not Ready
Inspection History: ENGR Paving
| Date |
Description |
Inspector |
Results |
Comments |
| 12/01/2025 |
ENGR Paving |
|
Not Ready |
contractor still placing. AB contractor will call in later this week for AB inspection |
| 12/04/2025 |
ENGR Paving |
|
Partial Pass |
The AB looks good grade looks good. There is one area that has standing water on the AB over by the trash enclosure. Contractor said he was good to address that area before paving. |
| 12/08/2025 |
ENGR Paving |
|
Partial Pass |
Contractor inform me he’s not paving until tomorrow |
| 12/11/2025 |
ENGR Paving |
|
Passed |
|