Inspection History Details
Inspection Status: Not Ready
Inspection History: ENGR Engineering Final
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/22/2026 | ENGR Engineering Final | Not Ready | Completed work is not in compliance with approved development package. Issues noted below. 1. New ADA access isle is not 8 feet wide 2. New ADA parking signage is missing 3. New ADA curb ramp running slope is greater than 8.33% (measured at 11.35%) 4. New pedestrian circulation across drive-through lane has cross-slope greater than 2% 5. Island at south-east corner was not removed, PAAL width is less than 24 feet at this point 6. 6 inch curb along drive-through lane was not installed 7. Curb ramp and striping for pedestrian circulation to trash enclosure were not installed 8. Long-term bicycle parking is not installed 9. Self-closing gates do not self close |
|
| 05/13/2026 | ENGR Engineering Final | Failed | Completed work is not in compliance with approved development package. Issues noted below. 1. New ADA access isle is not 8 feet wide 2. New ADA parking signage is missing 3. New ADA curb ramp running slope is greater than 8.33% (measured at 11.35%) 4. New pedestrian circulation across drive-through lane has cross-slope greater than 2% 5. Island at south-east corner was not removed, PAAL width is less than 24 feet at this point 6. 6 inch curb along drive-through lane was not installed 7. Curb ramp and striping for pedestrian circulation to trash enclosure were not installed |