Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Parcel: 13213104B


Addresses:

3300 S PARK AV


Inspection Status: Complete (Recurring)

Inspection History: COT - ENGR - Stormwater

Permit Number - TD-DEV-1222-00061

Inspection Description - COT - ENGR - Stormwater

Inspection Status - Complete (Recurring)

Date Description Inspector Results Comments
05/25/2023 COT - ENGR - Stormwater Complete (Recurring) Installing 24 inch HP on the southside of the project
06/22/2023 COT - ENGR - Stormwater Complete (Recurring) Contractor is pouring for the top of box culvert
06/26/2023 COT - ENGR - Stormwater Complete (Recurring) No concerns at this time for stormwater follow up
07/01/2024 COT - ENGR - Stormwater Complete (Recurring)
07/07/2023 COT - ENGR - Stormwater Partial Pass covert lid, number 10
07/12/2024 COT - ENGR - Stormwater Complete (Recurring) No concerns at this time with the storm water for this construction site. But do you have concerns at this time for the existing retention detention basins that are holding water past 12 hours. I have advised the contractor BFL to contact Rick engineering and let them figure out a solution to the problem of the standing water past 12 hours. They will be seeking a TCO for the new building in the next few weeks, but have been advised they will probably get their TC vote, but will not get a final CofO till all the drainage issues have been resolved.
07/24/2024 COT - ENGR - Stormwater Passed
09/21/2023 COT - ENGR - Stormwater Not Ready
09/25/2023 COT - ENGR - Stormwater Partial Pass Good to backfill 71 lineal feet of HD storm drain pipe on the east side of the building
09/28/2023 COT - ENGR - Stormwater Not Ready Contractors not ready reschedule for tomorrow
11/17/2023 COT - ENGR - Stormwater Complete (Recurring) Viewed 20’ of 18” storm drain pipe located at the SE section of building all bedding material is in place and density test has been completed by Pattison Engineering okay to backfill.
11/20/2023 COT - ENGR - Stormwater Partial Pass Base of storm drains look good, rebar is set and forms being placed. form and rebar inspection will be done on the 21st.
11/21/2023 COT - ENGR - Stormwater Complete (Recurring) East front section of Building (2) storm drain intakes are formed and all vertical and horizontal rebar is in place per approved plan and inspected by 3rd party Engineer Pattison, ready to pour.