Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Parcel: 13213104B


Addresses:

3300 S PARK AV


Inspection Status: Not Ready

Inspection History: ENGR Engineering Final

Permit Number - TD-DEV-1222-00061

Inspection Description - ENGR Engineering Final

Inspection Status - Not Ready

Date Description Inspector Results Comments
06/07/2024 ENGR Engineering Final Not Ready
07/03/2024 ENGR Engineering Final Not Ready
07/12/2024 ENGR Engineering Final Not Ready The contract is still working on this site at various locations and one need to have all work completed prior to scheduling this inspection since this inspection is for a Temporary Certificate of Occupancy for the school.

Also, the retention detention basin on the site is holding water past the 12 hour maximum limit, and will need to be checked by the engineer of record. I have advised BFL do you have the engineer of record look at the site and come up with a solution that will help eliminate all of the water within the 12 hour maximum limit.
07/24/2024 ENGR Engineering Final Passed