Inspection History Details
Inspection Status: Partial Pass
Inspection History: Grading Progress ENGR
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/25/2026 | Grading Progress ENGR | Partial Pass | contractor is good to pave the parking lot area the main line and the entrances | |
| 07/29/2026 | Grading Progress ENGR | Partial Pass | 7/29/26 Flood test showed a few areas in the asphalt paving that were problematic. -South refuse enclosure at crosswalk curb opening. There is significant puddling over a quarter of an inch this area. -North refuse enclosure at the bottom of the north end of apron, significant puddling. -At the flow line of the parking spaces north of the covered parking next to North refuse enclosure, significant puddling. -Landscaping areas need to be depressed 8" where possible and built to details J and O in grading details. -WHÌA's will need to be correct to meet CRWH Plan condition on permit prior to close out. Details on WH01 WH02 of DP. Side note: 18" Tree root barriers per detail B in landscaping sheets need to be in place. |
|
| 08/18/2026 | Grading Progress ENGR | Passed |