Inspection Status: Passed
Inspection History: Consultation SITE
| Date |
Description |
Inspector |
Results |
Comments |
| 02/03/2026 |
Consultation SITE |
|
Passed |
Curbs at entrance drive are poured in accordance with approved plans. |
| 02/27/2026 |
Consultation SITE |
|
Passed |
Sanitary Sewer manhole pour in Rosewood St: Inspected by Pima County Wastewater inspector Manuel Ulibarri. |
| 07/15/2026 |
Consultation SITE |
|
Passed |
Site walk to discuss TCO: Stairs to west will need connecting sidewalk and railing complete. Stairs to the east will need to be completed. Fencing will need to separate pedestrian paths from construction areas. A follow-up visit should be held to discuss the details further. |