Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Passed
Inspection History: NPPO Pre-Construction
Permit Number - TD-DEV-0924-00245
Inspection Description - NPPO Pre-Construction
Inspection Status - Passed
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/20/2025 | NPPO Pre-Construction | Passed | from the contractor that we needed to have all the test results all the material that has been used on site had to call him every two weeks for the sweep inspection |