Inspection History Details
Inspection Status: Partial Pass
Inspection History: ENGR Grading Final
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/12/2026 | ENGR Grading Final | Partial Pass | 01/12/26 Grading is not comptete. Basins are rough cut but not yet finished. Some are not yet dug because lightposts/wiring is not done. Some islands are cut correct to be below grade as WHIA but Grading is still in progress. What is done so far is correct as work in progress. |
|
| 01/21/2026 | ENGR Grading Final | Passed | 01/21/26 Grading is almost complete with the exception of basins to the east and asphalt paved area to the north. Contractor will be calling in landscaping, and paving inspections to ensure that these areas are finished correct. Slopes are correct drainage looks good. Water harvesting areas are graded or almost 100% for correct drainage. |