Inspection History Details
Inspection Status: Partial Pass
Inspection History: ENGR Engineering Final
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/11/2026 | ENGR Engineering Final | Partial Pass | 2/12/26 3 Caps labeled "SD" need to replace the sewer caps on the inspection pipes of the underground Storm Water Basin. Disturbed area North of side needs to have refuse removed and be hydroseeded as discussed with contractor. Reschedule this inspection when ready. |
|
| 03/04/2026 | ENGR Engineering Final | Passed |