Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit: TD-DEV-0923-00390

Parcel: 13801001D


Addresses:

6100 S 12TH AV

Inspection Status: Passed

Inspection History: Grading Progress ENGR

Date Description Inspector Results Comments
04/09/2026 Grading Progress ENGR Passed GSI basins are graded correctly, small water harvesting basin on north side is cut. Current plan on east side behind aquatics equipment building does not allow 5% slope for 10 feet away from building foundation (as required by IBC 1804.4)
10/28/2025 Grading Progress ENGR Partial Pass Stormwater harvesting areas are being worked on. Middle area where old islands were is being left at original elevation. Basin floor elevations are good where finished. Recommend a perc test sooner rather than later to ensure proper infiltration.