Inspection History Details
Inspection Status: Not Ready
Inspection History: ENGR Engineering Final
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/08/2026 | ENGR Engineering Final | Not Ready | Pool(s) not complete: railings, plumbing, floor finish not installed. Sidewalk at front entrance has an elevation change of greater than half an inch. Open electric boxes on east wall by therapy pool. Fencing not complete. Landscaping not finished, any deviations from the plans will require an As-Built and letter from Parks & Rec outlining the changes. Picnic table under canopy on south side wobbles, could crush small toes. Parking lot is being replaced under a separate contract, this needs to be shown as an as-built before this permit can be closed. |