Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

PRO is currently experiencing an outage. Some documents and records may not be available on PRO momentarily. We apologize for the inconvenience and are working to restore full access.

Permit: TD-DEV-0923-00390

Parcel: 13801001D


Addresses:

6100 S 12TH AV

Inspection Status: Partial Pass

Inspection History

Date Description Inspector Results Comments
04/09/2026 Partial Pass Completed sidewalks: Main entrance on west side, south side, north side, east side excluding behind aquatics equipment building; finished concrete is within necessary specifications. Make sure to remove expansion caps before final. Forms along west-south parking lot are set properly. Slopes of finished sidewalks and forms of proposed sidewalks are within specifications: <2% cross, <5% running.n
07/08/2026 Partial Pass Pedestrian circulation is in compliance with ADA requirements with the exception of the change in elevation listed below.

Flatwork on north side of 'Aquatics Equipment Building' not complete.
Sidewalk in front of 'Aquatics Facility Building' has a change in elevation of greater than 1/2", needs to be less than 1/4" or less than 1/2" with a beveled edge.