Inspection History Details
Inspection Status: Passed
Inspection History: PDSD Engineering Division Pre-Construction SITE
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/01/2026 | PDSD Engineering Division Pre-Construction SITE | Passed | Meeting held on-site, necessary inspections for this project are listed below. Drainage Pipe for underground drain pipes Paving for subgrade, AB, and asphalt Striping and signage for parking lot lines and ADA signs Sidewalk/Flatwork for sidewalk slopes and curb ramps Site consultation for general questions Engineering Final once project is complete |