07/28/2025 Not Applicable 7/28/25
Junior from Borderland consulted with me about how to coordinate inspection for putting in approximately 275 ft of 2’ copper pipe. It is potable water that will run about 9’ from the water main over to the water meter for the splash pad. Water will make the connection to the main later. 2” pipe will be in poly wrap. I can be back out late morning on Wednesday to check it. Call in inspection for Wednesday.
07/30/2025 Partial Pass 7/30/25 2“ copper pipe bedded and trenched correctly at the correct depth per TW SD-309 Pipe has poly wrap and blue tracer wire. Okay to backfill. Pressure test on Friday. 90 pounds for 15 minutes.
08/11/2025 Partial Pass 8/11/25
Pressure test for water pipe servicing the Splash pad. Test calls for maintaining 90lbs. for 15 minutes. Dial read at 100 lbs. for 15 + minutes with no drop. Pictures attached.
12/05/2025 Partial Pass 12/5/25
2" water main from Meter to the first leg installed in 8/25
2" K pipe installed with Febco Backflow preventer. Pipe/ Joints pressure tested and no leaks at joints. Copper poly tape wrapped. Blue tracer wire in place. Pipe bedded and trenched correct. Ok to backfill.