Inspection History Details
Inspection Status: Passed
Inspection History: SITE - Stormwater Setup and Controls
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/28/2026 | SITE - Stormwater Setup and Controls | Passed | Contractor will place wattle to south side of Basin to protect the south slope and basin from storm water sheet flowing into it. Also wattle will be placed at new basin outlet weir into North channel. Other BMPs are in place including track out and wattle o round stock piles that are not actively being worked. |