Inspection Status: Partial Pass
Inspection History: ENGR - Drainage Structures
| Date |
Description |
Inspector |
Results |
Comments |
| 09/16/2026 |
ENGR - Drainage Structures |
|
Partial Pass |
Outlet weir from storm water basin into drain channel at north of site is correct to plan. OK to pour weir |
| 09/28/2026 |
ENGR - Drainage Structures |
|
Partial Pass |