Inspection History Details
Inspection Status: Partial Pass
Inspection History: SITE - Stormwater Setup and Controls
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/23/2025 | SITE - Stormwater Setup and Controls | Partial Pass | contractor needs to cut in V ditch on the East End of the building force swppp and a ditch on the north west corner |