Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Parcel: 11506107B


Addresses:

1910 N STONE AV


Inspection Status: Scheduled

Inspection History: SITE - Stormwater Follow-up

Permit Number - TD-DEV-0724-00202

Inspection Description - SITE - Stormwater Follow-up

Inspection Status - Scheduled

Date Description Inspector Results Comments
SITE - Stormwater Follow-up Scheduled
07/11/2025 SITE - Stormwater Follow-up Complete (Recurring) See details in the checklist.
07/23/2025 SITE - Stormwater Follow-up Complete (Recurring) 7/23/25
Use wattle to protect the spoils piles that are not actively being used on south side of site. Maintain bmp or wattle at the downgrade west end of the site on stone to maintain function. Wrap SW corner with additional wattle and extent waddle 25 ft or so along south edge from corner to protect Stone from sediment.
09/22/2025 SITE - Stormwater Follow-up Failed 9/22/25
Trackout-not to plan. Use detail in appendix M of SWPPP plan

Wattle-around perimeter And also stockpiles not in active use..I did not see any wattle around stockpiles

Inlet and Outlet protection.
Currently Stone Ave is open to Sediment being washed out onto it. The site slopes down to it. A Trackout to plan with Waddle installed across it as in the Site plan would help. A swale bypassing the Trackout with effective outlet protection as shown in Appendix M would be best.

Concrete washout- not to plan- currently non existent concrete on the ground. Use Detail in Appendix M of SWPPP plan.

Material, Hazardous material and Vehicle Storage areas not defined to plan.