Inspection Status: Partial Pass
Inspection History
| Date |
Description |
Inspector |
Results |
Comments |
| 07/23/2026 |
|
|
Partial Pass |
Curb forms along south border: forms are set accurately to survey stakes and slopes are consistent with approved plans. Okay to pour. |
| 07/31/2026 |
|
|
Partial Pass |
Sidewalks on East side of building, adjacent to building, including patio area in NE corner, excluding connection to ROW sidewalk: forms are set correctly with appropriate slopes, expansion joints not yet in place. Okay to pour pending expansion joints. |
| 08/10/2026 |
|
|
Partial Pass |
Footer for light pole inspection: Footer correct. Okay to pour footer in refuse enclosure. |
| 08/12/2026 |
|
|
Canceled |
|
| 08/18/2026 |
|
|
Partial Pass |
Flatwork adjacent to building except for ramps on east and west sides correct. Curb on east side of handicap access is over 8.33 %. Be careful that slope of ramp does not exceed 8.33%. Compaction testing is being done, submit results to portal. Schedule inspections for other ramps and scuppers. |
| 08/21/2026 |
|
|
Partial Pass |
This inspection for planter walls detailed in the landscaping plan of DP. They are correct to plan and TSM wall specifications. Call in pre grout inspection when ready. |
| 09/15/2026 |
|
|
Partial Pass |
Okay to pour scuppers south of building and ramp on west side |