Inspection History Details
Inspection Status: Passed
Inspection History: ENGR - Drainage Structures
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/12/2024 | ENGR - Drainage Structures | Passed | Viewed at total of (6) Canopy Column footers 7’ x 6” depth x 24” (Okay to pour concrete) |