Inspection History Details
Inspection Status: Not Ready
Inspection History: ENGR Engineering Final
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/25/2025 | ENGR Engineering Final | Not Ready | Striping at site does not match plan on Development Package. Existing Handicap parking is located at east end of building. DP plan has no parking in front of East Entry Patio. Striping layout must be to plan. Plan also shows 5' crosswalk across north parking area to access ADA Parking space that doesn't exist. No short term bike parking per plan. No long term bike parking per plan. No sidewalk has been installed. On DP there are no wheel stops shown on plan in front of east patio. If no wheel stops are on DP there needs to be grade separation or bollards between Patio and Drive way area. This should be addressed. |
|
| 07/02/2025 | ENGR Engineering Final | Not Ready | Approved Plans show 2 short term "U" racks in the detail. However it shows 1 in the Site Plan so 1 is okay. The U rack has been installed in the wrong location. It is installed to the west of entry patio instead of under it per plan. No long term bike parking has been installed per plan. The ADA van Accessible Parking sign must be installed in the correct location. It has been left in wrong place after restriping. The signage will need to be included for both locations. ADA Parking space is the wrong width by the entryway. Per plan it is 12.5'. It is less that. Per plan that is the only parking space by the entryway. The wheel stops to the East of the building need to be addressed. They are not shown on the plan because that side is not intended as parking. In Addition to this condition there is no Grade Separation between the East Existing Entry Way Patio and the 2-way driveway... See attached picture of existing condition. |
|
| 07/21/2025 | ENGR Engineering Final | Passed |