Inspection History Details
Inspection Status: Passed
Inspection History: PDSD Engineering Division Pre-Construction SITE
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/02/2024 | PDSD Engineering Division Pre-Construction SITE | Passed | Completed pre-construction meeting with Carlos Gomez and reviewed existing parking lot and made them aware of the (2) handicap parking spaces on the far NW end of site appeared to be well over 2% and need to be addressed along with the (2) handicap parking spaces at the center West location of existing parking lot need to be verified space to the North appears to be over 2%. The layout for trash enclosure was given to Carlos and we went over all footer, height of walls, and bollard details and explained that we will need to inspect the enclosure. The area on the West side of site between Big O tires will have wattle installed on Monday of next week per Carlos. Carlos will provide landscape invoice when landscape is completed. |
|
| 10/05/2023 | PDSD Engineering Division Pre-Construction SITE | Partial Pass | Site is being readied for construction. Site fence is being installed now and parking lot, curb are in. |