Inspection Status: Partial Pass
Inspection History: SITE - Stormwater Final Inspection
| Date |
Description |
Inspector |
Results |
Comments |
| 05/13/2024 |
SITE - Stormwater Final Inspection |
|
Partial Pass |
contractor did not finish the water harvesting on the west side. Contractor needs to speak to the engineer of record to redesign the water harvesting on the west side, and on the north side of the project |
| 07/29/2024 |
SITE - Stormwater Final Inspection |
|
Passed |
The commercial stormwater for this site has been completed as most of the site is totally done and being occupied |