Inspection History Details
Inspection Status: Partial Pass
Inspection History: ENGR Engineering Final
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/13/2024 | ENGR Engineering Final | Partial Pass | water harvesting on the north and on the west side need to be re-designed by the engineer of record. Good for a level 3 TCO | |
| 05/14/2024 | ENGR Engineering Final | Partial Pass | Contractor needs to complete the installation of the plants on the south end of the building finished the water harvesting on the west end, and on the north end of the building | |
| 07/29/2024 | ENGR Engineering Final | Partial Pass | I met with a contractor for the site and have determined that the following items still need to be checked prior to the finalization of this project. 1) Replace any trees that appear to look as if they are dead and or are missing on this project. Stake all trees according to the approved plans with double stakes as shown on the plan details or provide no stakes at all, single staked trees need to be corrected. 2) The engineer of record needs to provide documentation for the water harvesting on this site to show how it has been met since some of the areas do not appear to have water harvesting being able to be collected as noted on the approved plans. |
|
| 10/03/2024 | ENGR Engineering Final | Passed |