Inspection Status: Partial Pass
Inspection History: SITE
| Date |
Description |
Inspector |
Results |
Comments |
| 04/03/2024 |
SITE |
|
Partial Pass |
Contractor had to pull out 35 lineal feet of sidewalk NONCOMPLIANT with City Of Tucson |
| 04/17/2024 |
SITE |
|
Not Ready |
Has not started the water harvesting areas |
| 05/17/2024 |
SITE |
|
Passed |
Rain Water Harvesting is questionable along the Southern Portion of the Site due to existing grade changes for the nex sidewalk and the existing Roadway. Engineer of Record has been asked to provide documentaion showing how the CRWH has been met for this site. |