Inspection History Details
Inspection Status: Partial Pass
Inspection History: ENGR Engineering Final
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/27/2026 | ENGR Engineering Final | Partial Pass | Fix handicap parking striping so it matches detail on page 6. It is .5' short. (And sign- see signage inspection notes) Remove current crosswalk between 6" curb bullnoses between building and Lightpost bullnose. Repaint 4' access aisle so it follows As-built plans ADA route dashed line from where sidewalk has 0" vertical separation at east side of transformer bullnose south around bull nose and west to north end of Refuse Enclosure apron. Fix scupper DG grade where it meets invert of scupper at SE building corner bullnose. They should be the same so water drains correctly to basin. If there is no long term bicycle parking provided outside building than there needs to be a bike hook provided inside for long term storage for employees. |
|
| 06/01/2026 | ENGR Engineering Final | Passed | ||
| 12/02/2025 | ENGR Engineering Final | Not Ready | Contractor still needs a complete all the landscaping area and finish paving | |
| 12/09/2025 | ENGR Engineering Final | Not Ready |