Inspection History Details
Inspection Status: Canceled
Inspection History: Consultation SITE
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/13/2026 | Consultation SITE | Canceled | ||
| 05/22/2026 | Consultation SITE | Passed | Discussed outstanding inspections on Development package and requirements for close out of com and dev permits | |
| 07/30/2025 | Consultation SITE | Passed | 07/30/25, Consultation was in regard to a light pole on Park Ave being in the Valvoline driveway. This would be a right away/transportation issue. | |
| 12/04/2025 | Consultation SITE | Partial Pass | contractor needs to address the downspouts with the sidewalk scupper. The landscaping is not completed . The striping has not been completed. The handicap parking area is not completed. The trash enclosure was not completed yet |
|
| 12/05/2025 | Consultation SITE | Not Ready | Site still undergoing significant construction work. Not ready for a TCO at this point. |