Inspection Status: Partial Pass
Inspection History: COT - ENGR - Stormwater
| Date |
Description |
Inspector |
Results |
Comments |
| 01/06/2025 |
COT - ENGR - Stormwater |
|
Partial Pass |
Contractor is good to slurry the 10 inch stormwater drain 50 foot long and slurry the 8 inch storm water drain that goes under the reclaimed water on the same run |
| 01/14/2025 |
COT - ENGR - Stormwater |
|
Complete (Recurring) |
Drainage pipe between tiger life and panda buildings, passed on 01/14/25 |
| 01/15/2025 |
COT - ENGR - Stormwater |
|
Passed |
Drainage pipe between tiger life and panda buildings, passed on 01/14/25, same area the next 60' of pipe passed on 01/15/25, |
| 08/21/2024 |
COT - ENGR - Stormwater |
|
Complete (Recurring) |
Pipe in grassy area looks good, backfill. SWPPP is being maintained throughout. |
| 11/13/2023 |
COT - ENGR - Stormwater |
|
Not Ready |
|
| 12/04/2024 |
COT - ENGR - Stormwater |
|
Complete (Recurring) |
No issues, all maintenance is being cared for as project moves forward. |
| 12/30/2024 |
COT - ENGR - Stormwater |
|
Partial Pass |
continued installation of the roof drainage pipeline into the vault, 12/30/24. |