Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Partial Pass
Inspection History: SITE - Stormwater Follow-up
Permit Number - TD-DEV-0523-00249
Inspection Description - SITE - Stormwater Follow-up
Inspection Status - Partial Pass
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
04/26/2024 | SITE - Stormwater Follow-up | Partial Pass | No concerns at this time | |
05/21/2024 | SITE - Stormwater Follow-up | Complete (Recurring) | No issues, all storm water controls in place and in good shape | |
06/21/2024 | SITE - Stormwater Follow-up | Complete (Recurring) | No stormwater issues at this time. All controls appear to be in place and working. | |
07/16/2024 | SITE - Stormwater Follow-up | Complete (Recurring) | Site is in good shape, all BMPs are in place. | |
08/21/2024 | SITE - Stormwater Follow-up | Complete (Recurring) | Pipe in grassy area looks good, backfill. SWPPP is being maintained throughout. | |
09/09/2024 | SITE - Stormwater Follow-up | Complete (Recurring) | There is no concerns at this time | |
11/13/2023 | SITE - Stormwater Follow-up | Not Ready | ||
11/19/2024 | SITE - Stormwater Follow-up | Complete (Recurring) | No concerns at this time everything looks good | |
12/03/2024 | SITE - Stormwater Follow-up | Complete (Recurring) | No Issues, all BMP maintenance is being completed. | |
12/12/2024 | SITE - Stormwater Follow-up | Canceled |