Inspection Status: Partial Pass
Inspection History: For trash and recycling enclosures
| Date |
Description |
Inspector |
Results |
Comments |
| 05/06/2025 |
For trash and recycling enclosures |
|
Partial Pass |
05/06/25, footing inspection completed by building. |
| 06/12/2025 |
For trash and recycling enclosures |
|
Partial Pass |
06/12/25, slab inspection passed. |
| 06/20/2025 |
For trash and recycling enclosures |
|
Partial Pass |
Rebar and bond beam are accurate in NE section of wall, okay to grout the top course. Rebar and horizontal reinforcement are in place for the West, South, and SE portions of wall, okay to grout next lift. |
| 06/24/2025 |
For trash and recycling enclosures |
|
Partial Pass |
-6/2425, bond beam in[lace on the east wall and south wall. |
| 07/28/2025 |
For trash and recycling enclosures |
|
Partial Pass |
07/28/25, top of block at side entrance to west wall good to grout. |