Date Description Inspector Results Comments
05/06/2025 Partial Pass 05/06/25, Rebar and forms set to place for wall/fence line, good to pour first section.
05/20/2025 Partial Pass 05/20/25, wall for roll off trash enclosure and west side wall. 4' grout and stem walls.
05/22/2025 Partial Pass 05/22/25, bottom block of wall construction on trash enclosure and that bond beam. West side wall construction south end prior to the gate. Good to grout both.
05/28/2025 Partial Pass 05/28/25, south side of the west wall top out 70' center section
06/06/2025 Partial Pass 06/06/25, good to,grout last section of west wall
06/16/2025 Partial Pass 06/16/25, Completed top out of the 4 columns next to gate area
06/20/2025 Partial Pass Stem wall on the perimeter of site, just West of refuse enclosure has appropriate horizontal & vertical reinforcement and bond beam is in place, okay to grout up to and including top course.
07/15/2025 Partial Pass 07/15/25, top of walls at west entrance are good to grout.
Footing on fence wall at east side fence line is good to pour.
08/08/2025 Partial Pass Retaining wall along East access road, dimensions and reinforcement is accurate, is good to pour.
Drainage pipe from catch basins 19 to 20 is installed proper and okay to backfill.
Otter house west wall: coordinated with building inspector, reinforcement is correct, okay to grout.
Visitor bldg west wall: coordinated with building inspector, reinforcement is correct, okay to grout.
08/14/2025 Partial Pass 8' AZA cmu wall, final section to the far west, connecting to existing zoo structure: footing dimensions and reinforcement are correct. Make sure excess dirt is cleaned out. Okay to pour footing.
10/10/2025 Partial Pass Okay to grout 2nd lift of west site wall
10/16/2025 Partial Pass Okay to grout 2nd lift.
10/17/2025 Partial Pass Okay to grout final course on SW site wall.