| 05/06/2025 | Partial Pass | 05/06/25, Rebar and forms set to place for wall/fence line, good to pour first section. | ||
| 05/20/2025 | Partial Pass | 05/20/25, wall for roll off trash enclosure and west side wall. 4' grout and stem walls. | ||
| 05/22/2025 | Partial Pass | 05/22/25, bottom block of wall construction on trash enclosure and that bond beam. West side wall construction south end prior to the gate. Good to grout both. | ||
| 05/28/2025 | Partial Pass | 05/28/25, south side of the west wall top out 70' center section | ||
| 06/06/2025 | Partial Pass | 06/06/25, good to,grout last section of west wall | ||
| 06/16/2025 | Partial Pass | 06/16/25, Completed top out of the 4 columns next to gate area | ||
| 06/20/2025 | Partial Pass | Stem wall on the perimeter of site, just West of refuse enclosure has appropriate horizontal & vertical reinforcement and bond beam is in place, okay to grout up to and including top course. | ||
| 07/15/2025 | Partial Pass | 07/15/25, top of walls at west entrance are good to grout. Footing on fence wall at east side fence line is good to pour. |
||
| 08/08/2025 | Partial Pass | Retaining wall along East access road, dimensions and reinforcement is accurate, is good to pour. Drainage pipe from catch basins 19 to 20 is installed proper and okay to backfill. Otter house west wall: coordinated with building inspector, reinforcement is correct, okay to grout. Visitor bldg west wall: coordinated with building inspector, reinforcement is correct, okay to grout. |
||
| 08/14/2025 | Partial Pass | 8' AZA cmu wall, final section to the far west, connecting to existing zoo structure: footing dimensions and reinforcement are correct. Make sure excess dirt is cleaned out. Okay to pour footing. | ||
| 10/10/2025 | Partial Pass | Okay to grout 2nd lift of west site wall | ||
| 10/16/2025 | Partial Pass | Okay to grout 2nd lift. | ||
| 10/17/2025 | Partial Pass | Okay to grout final course on SW site wall. |