Inspection History Details
Inspection Status: Partial Pass
Inspection History
Permit Number - TD-DEV-0523-00249
Inspection Description -
Inspection Status - Partial Pass
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/24/2025 | Partial Pass | 06/24/25, Flat to 1%. Sidewalk on the northwest side. Good to pour. | ||
| 06/26/2025 | Partial Pass | 06/26/25, concrete pour on the 1st section on the west end is within tolerance and looks good. 06/26/25, forms for 2nd section of the west end sidewalk are good. |
||
| 07/01/2025 | Partial Pass | 07/01/25, footings for columns passed, these are @ opening in the middle of the perimeter block wall looking at the entrance to the pool building. | ||
| 07/10/2025 | Partial Pass | Sidewalk extension along West side: layout, forms, subgrade, and reinforcement are good, okay to pour. Wall section along West side: Horizontal and Vertical reinforcement is accurate, okay to grout. |
||
| 07/17/2025 | Partial Pass | Contractors good to pull the sidewalk area | ||
| 07/21/2025 | Partial Pass | Contractors good to support the sidewalk. Everything is foreign up correctly and all expansions are in. | ||
| 07/31/2025 | Partial Pass | Contractor for the sidewalk on the west side | ||
| 08/04/2025 | Partial Pass | Contractor will call in for reinspection on the flat work sidewalk. The 10 inch storm waterline that was installed is good to backfill. | ||
| 08/20/2025 | Partial Pass | Architect we designed the patio area where we could not get the 2%. Architect is installing a planner to break up the area where we could not get our 2% contractor will as build it on the set up plans. | ||
| 10/23/2025 | Partial Pass | Contractor can pour the ribbon around the sidewalk area | ||
| 10/27/2025 | Partial Pass | Contractor poor the patio area on the north west side | ||
| 11/20/2025 | Not Ready | Rain day contractor did not work today | ||
| 11/24/2025 | Partial Pass | Contractors good to pour the last of the patio slab on the north west side |