Parcel: 12620001C


Addresses:

3400 E ZOO CT


Inspection Status: Partial Pass

Inspection History

Permit Number - TD-DEV-0523-00249

Inspection Description -

Inspection Status - Partial Pass

Date Description Inspector Results Comments
01/21/2025 Partial Pass drainage pipe looked at in 3 separate areas, 01/21/25
01/22/2025 Partial Pass Section adjacent to yesterday’s pipe location, passed good to backfill. 01/22/25
01/24/2025 Partial Pass Section again on the southwest corner of the exhibit. okay to backfill. 01/24/25
07/11/2025 Partial Pass 7/11/25 At the far west end of the site I looked at one 4" iron pipe and one 12" iron approximately 100' length. These run parallel between the pump vault to the south sloping up to the backwater valve vault to the north. Slope is correct. Pressure test has held water at 100 lbs for an hour in both pipes. The dials read 100 lbs. This complies. Originally it was designed using HDPE but has been revised to ductile iron. Subsequent revision approved. Contractor informed me As-Builts will be submitted for these pipes. Okay to back fill. see details in checklist.
07/22/2025 Partial Pass Doctor is good to backfill 40 lineal feet of storm drain pipe
07/25/2025 Partial Pass Drainage pipe (through center of project, from ‘tiger enclosure tie-in’ catch basin to next catch basin upstream is installed correctly and okay to backfill.
08/07/2025 Partial Pass Contractor continues to install the storm drain good to backfield for the next hundred feet
08/11/2025 Partial Pass Contractor is good to to backfill storm drain pipe line Street cluster mines
08/18/2025 Partial Pass 08/18/25, inspection on the pool drain and drain valve, set pitch to pipe from pool is 12.5% but due to a fiber optics line it will be set at 10%. Please note this on an as built.
08/28/2025 Not Ready contractor will call inspection when ready
08/29/2025 Partial Pass 08/29/25, continued underground roof drain system. Passed good to backfill
09/04/2025 Partial Pass Drain pipe on west side is good to backfill
09/08/2025 Partial Pass Final leg of drainpipe coming from roof detention pond behind the pavilion to the storm drain.
09/12/2025 Partial Pass 9/12/25. 4 inch PVC drain pipe runs along the north side of pavilion. Connection to basin to the north will be done later. 3 Y tie ins are in for roof drains. Pipe is bedded and sloped .5 % correctly. OK to leave Y tires open and shade backfill other areas as progress requires. Make sure pipe stays clear of debris. Compact backfill underneath sidewalk areas. okay to backfill.
09/23/2025 Partial Pass Contract is good to backfill the 4 inch pipe coming off the roof drainage
10/10/2025 Partial Pass Okay to backfill SD run from CB19-19A
11/07/2025 Partial Pass Bedding required prior to backfill. Photos sent. Okay for Backfill
11/19/2025 Partial Pass 11/19/25 - Catch basins 19A, 19B, 19C okay to backfill.
Scheduled
12/10/2024 Complete (Recurring) This was for the 2nd set of pipes and structures installed