Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Partial Pass
Inspection History: ENGR - Drainage Structures
| Date |
Description |
Inspector |
Results |
Comments |
| 01/16/2025 |
ENGR - Drainage Structures |
|
Partial Pass |
Drainage pipe to the North of the tiger building. Good to backfill up to the unfinished drain pipe connection. 01/16/25 |
| 06/16/2025 |
ENGR - Drainage Structures |
|
Canceled |
|
| 11/13/2023 |
ENGR - Drainage Structures |
|
Not Ready |
|
| 12/13/2024 |
ENGR - Drainage Structures |
|
Partial Pass |
Vault looked at on 12/13/2024 good to backfill |