Inspection History Details
Inspection Status: Passed
Inspection History: PDSD Engineering Division Pre-Construction SITE
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/03/2026 | PDSD Engineering Division Pre-Construction SITE | Passed | I notified the contractor to apply for a TNE through the City Manager’s office. The Bank does not want him working during business hours. Site is fenced off. Inspections needed: -Paving -Striping -Flatwork/sidewalk -Handrail -Engineering Final |