Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Passed
Inspection History: NPPO Pre-Construction
| Date |
Description |
Inspector |
Results |
Comments |
| 02/06/2025 |
NPPO Pre-Construction |
|
Passed |
I passed a freak on once before. I checked the wattles. Everything is in good. |
| 12/11/2024 |
NPPO Pre-Construction |
|
Re-inspection required |
Informed the contractor to call in every two weeks for swept inspections and for any thing else that he needs out here. Right now he needs to install the wattles and the track out rock. |